Using a unit assessment tool to optimize patient flow and staffing in a community hospital

Jt Comm J Qual Improv. 2002 Jan;28(1):31-41. doi: 10.1016/s1070-3241(02)28004-9.

Abstract

Background: Hospital environments are too often characterized by delays for patients receiving diagnostic testing and prolonged waiting times to complete needed therapy. Frequently there is confusion in scheduling, related at least in part to the complex interplay of clinical acuity and highly individualized care. Luther Midelfort recently began to change the process of patient flow to improve access to care, optimize outcomes by enabling timely intervention, and decrease the wasting of resources.

Unit assessment tool: The hospital developed a unit assessment tool based on the traffic light concept, which consisted of an assessment of current capacity and a graded, color-coded "workload tolerance" for each hospital unit. Each unit can instantly update its own status and query those of other work environments in the hospital.

Experience with the unit assessment tool: For most of the January-July 2001 period, there was generally a progressive decrease in the percentage of time that the units were coded as red (unit closed to new admissions), with concurrent increases in the percentage of time that the units were coded as green (unit open). Use of the tool appears to have contributed to a dramatic increase in staff satisfaction.

Summary and conclusions: The key to regulating patient flow has been to adopt a nursing-initiated capping trust policy whereby nurses are given the authority to limit new admissions. Initiatives are now under way to provide different units with novel models of resource sharing, ranging from flexible housekeeping to "flying nurse squads" to assist units that have become red.

MeSH terms

  • Appointments and Schedules*
  • Color
  • Delivery of Health Care, Integrated
  • Forms and Records Control
  • Health Care Rationing / methods
  • Hospital Units / organization & administration
  • Hospital Units / statistics & numerical data*
  • Humans
  • Job Satisfaction
  • Nursing Staff, Hospital / psychology
  • Nursing Staff, Hospital / supply & distribution*
  • Patient Care Management / methods*
  • Personnel Staffing and Scheduling / standards*
  • Pilot Projects
  • Process Assessment, Health Care*
  • Systems Analysis
  • Time Management
  • Total Quality Management / methods*
  • Waiting Lists
  • Wisconsin
  • Work Schedule Tolerance*
  • Workforce
  • Workload / classification*
  • Workload / psychology