Inventory-transportation integrated optimization for maintenance spare parts of high-speed trains

PLoS One. 2017 May 4;12(5):e0176961. doi: 10.1371/journal.pone.0176961. eCollection 2017.

Abstract

This paper presents a 0-1 programming model aimed at obtaining the optimal inventory policy and transportation mode for maintenance spare parts of high-speed trains. To obtain the model parameters for occasionally-replaced spare parts, a demand estimation method based on the maintenance strategies of China's high-speed railway system is proposed. In addition, we analyse the shortage time using PERT, and then calculate the unit time shortage cost from the viewpoint of train operation revenue. Finally, a real-world case study from Shanghai Depot is conducted to demonstrate our method. Computational results offer an effective and efficient decision support for inventory managers.

MeSH terms

  • China
  • Equipment and Supplies
  • Maintenance
  • Railroads*
  • Transportation*