Research on extremely short construction period of engineering project based on labor balance under resource tolerance

PLoS One. 2022 Mar 30;17(3):e0266036. doi: 10.1371/journal.pone.0266036. eCollection 2022.

Abstract

Under the condition of resource tolerance, engineering construction projects face the problem of labor force balance in the working face. Notably, a deviation occurs between the distribution and certain demand of the labor force in the limited working face, which affects the realization of an extremely short construction period. To address this problem, we first introduced the stochastic coefficient of labor force equilibrium to measure the degree of labor balance. Second, a labor force equilibrium model with the realization goal of an extremely short construction period was established. Then, the standard particle swarm optimization (PSO) algorithm was improved from two perspectives to solve the proposed model. The update equation was rounded to solve practical project problems, and a dynamic variable inertia weight was adopted to ensure the PSO algorithm accuracy and convergence speed. Finally, through case analysis, we determined the extremely short construction period and best labor force distribution scheme. Moreover, the case results revealed that the established model is simple, operable and practical and that the proposed algorithm achieves a high search accuracy and efficiency in the model solution process. Overall, under the condition of resource tolerance, this study provides scientific and effective references for managers to realize an extremely short construction period.

Publication types

  • Research Support, Non-U.S. Gov't

MeSH terms

  • Algorithms*
  • Construction Industry*
  • Data Collection
  • Employment

Grants and funding

The authors gratefully acknowledge the funding and support provided by the Natural Science Foundation of Hunan Province, China (No: 2021JJ30746), (No: 2015JJ32004).