Skip to main page content
U.S. flag

An official website of the United States government

Dot gov

The .gov means it’s official.
Federal government websites often end in .gov or .mil. Before sharing sensitive information, make sure you’re on a federal government site.

Https

The site is secure.
The https:// ensures that you are connecting to the official website and that any information you provide is encrypted and transmitted securely.

Access keys NCBI Homepage MyNCBI Homepage Main Content Main Navigation

Search Page

Filters

My Custom Filters

Edit custom filters

Results by year

Table representation of search results timeline featuring number of search results per year.

Year Number of Results
2007 1
2008 1
2026 0

Publication date

Text availability

Article attribute

Article type

Additional filters

Article Language

Species

Sex

Age

Other

Search Results

2 results

Results by year

Filters applied: . Clear all
Page 1
Did you mean m lotfaliany (10 results)?
Efficiency of Timber Jack 450C with different loading volumes in different slopes.
Lotfalian M, Daliri HS, Kooch Y. Lotfalian M, et al. Pak J Biol Sci. 2007 Oct 15;10(20):3668-72. doi: 10.3923/pjbs.2007.3668.3672. Pak J Biol Sci. 2007. PMID: 19093479
The first, collection of data have noted in special form and then have converted to uniform unit of m sec(-1). Descriptive statistics for each data set were calculated using the SPSS software. ...
The first, collection of data have noted in special form and then have converted to uniform unit of m sec(-1). Descriptive statistics …
Physical soil properties and slope treatments effects on hydraulic excavator productivity for forest road construction.
Parsakho A, Hosseini SA, Jalilvand H, Lotfalian M. Parsakho A, et al. Pak J Biol Sci. 2008 Jun 1;11(11):1422-8. doi: 10.3923/pjbs.2008.1422.1428. Pak J Biol Sci. 2008. PMID: 18817241
The road length and cross section profiles after each 20 m were selected to estimate earthworks volume. Results showed that the mean production rates for the pc 220 komatsu excavators were 60.13 m3 h(-1) and earthwork 14.76 m h(-1) when the mean depth of excavation …
The road length and cross section profiles after each 20 m were selected to estimate earthworks volume. Results showed that the mean …