Incineration has an important place in waste management in France. In 2003, around 130 incineration plants have treated 12.6 Mt of non-dangerous waste, mainly composed of household waste (10.8 Mt), non-dangerous waste from industry, business, services (1.0 Mt), sewage sludge (0.2 Mt) or clinical waste (0.1 Mt). The incineration of these wastes generated 3.0 Mt of bottom ash of which 2.3 Mt were used for roads construction and 0.2 Mt of ferrous and non-ferrous metal were recycled. It also produced 2,900,000 MWh of electricity, of which 2,200,000 MWh were sold to Electricité de France (EDF) and 9,100,000 MWh of heat, of which 7,200,000 MWh were sold to private or public users. These French incinerators of non-hazardous waste are currently being thoroughly modernized, thus making possible the consolidation and the enhancement of their environmental and energy performance. This process is related to the implementation of the European Directive 2000/76/CE whose expiration date is 28 December 2005. Upon request of ADEME, the engineering company GIRUS has realised the first technical and economical evaluation of works necessary to bring incinerators into compliance. The financial estimations, carried out in 30 June 2003, show that the investments to be devoted could reach 750 million euros. This assessment shed new light on the situation of non-hazardous waste incinerators, including an identification and a rank ordering for each incinerator of the most frequent and the most complex non-conformities to be solved in term of cost and delay. At last, this assessment gives the solutions for each non-compliance.